Installation of laminate flooring is one of the last jobs of a new home construction. Prior to installing a laminate floor, ensure that:
- The building is completely enclosed with all outside doors and windows in place and securable, including a door from an attached garage to house interior
- All concrete, masonry, plastering, drywall, texturing, painting and other wet work is complete and thoroughly cured and dry
- Basements and crawlspaces are dry. Crawlspaces must have no standing water; crawlspaces must also have a vapor barrier and adequate ventilation in accordance with local building codes.
- Gutters and downspouts are in place, directing water away from the building
- HVAC systems are fully operational, enabling heat and humidity levels to be controlled and maintained throughout the home
- Subfloor is properly prepared for installation
- If installing over radiant heat, ensure that the system is in full working order and has been fully tested and running for a minimum of two weeks p